Leisure Centre Access Scaffold Project in London

Leisure Centre Access Scaffold Project in London

Location: London
Sector: Leisure Centre
Client: Starfish
Project Duration: 35 Weeks

Project Overview

AMA Scaffolding was appointed by Starfish to deliver a fully designed scaffolding solution for a leisure centre project in London. The works required a safe and practical access arrangement while the building remained open to the public throughout the duration of the project.

Working on an operational leisure centre required careful planning and a scaffold system that supported the project requirements while maintaining safe public access. The structure was designed to provide reliable access and incorporate protective measures where required.

Our team carried out the full erection and dismantling of the scaffold, with the system remaining in place for the full 35-week programme.

Scope of Works

AMA Scaffolding delivered a fully designed scaffold solution tailored to the requirements of the site.

The works included:

  • Independent access scaffold installation
  • Pedestrian fan for public protection
  • Heavy duty loading bay for material handling
  • Affix system staircase for site access
  • Full scaffold design
  • Erection and dismantling of scaffold

The scaffold was configured to provide safe access for the works while allowing the leisure centre to continue operating.

Designed Scaffold Solution

Due to the duration of the project and the operational nature of the building, a fully designed scaffold system was required. The scaffold was designed to suit the building layout and support the works over the 35-week period.

The structure incorporated access points, material handling areas and public protection measures, ensuring the scaffold remained suitable throughout the project duration.

Live Site Environment

As the leisure centre remained open for the full duration, the scaffold arrangement was installed to allow safe public movement around the building. The pedestrian fan provided additional protection while works were carried out above.

The scaffold remained in place throughout the project, supporting the ongoing works while the building continued to operate.

Outcome

AMA Scaffolding successfully delivered a fully designed scaffold solution for the London leisure centre project. The scaffold supported the works while allowing the site to remain operational for the entire 35-week duration.

Project highlights included:

  • Fully designed scaffold solution
  • 35-week project duration
  • Installation within a live environment
  • Public protection measures incorporated
  • Full erection and dismantling completed
  • Leisure centre remained open throughout

The completed scaffold arrangement provided safe access and protection for the duration of the project.

Why This Project Matters

This project demonstrates AMA Scaffolding’s ability to deliver designed scaffold solutions in live environments. The London leisure centre remained open throughout the 35-week duration, with the scaffold supporting the works while maintaining safe public access.