Client: Loco Services
Location: National Physical Laboratory, Teddington, London
Sector: Building Maintenance and Heritage Renovation
Service: Independent Access Scaffolding for Window Renewal Works
Programme: Two-week duration
Company: AMA Scaffolding
Project Overview
AMA Scaffolding was appointed to provide specialist access scaffolding at the National Physical Laboratory, an iconic and nationally significant scientific site located in Teddington, London. The project supported window replacement works and the renewal of timber elements surrounding existing windows, requiring carefully planned access solutions that respected the character and importance of the building.
The client for this project, Loco Services, required a reliable and professional scaffolding partner capable of delivering safe, independent access for renovation works within a sensitive and high-profile environment. The scaffolding installation was completed on 23/10/24 and remained in place for a two-week programme.
Scope of Works
AMA Scaffolding designed, erected, and dismantled independent access scaffolding to allow window replacement and timber renovation works to be carried out safely and efficiently. The scaffolding system was configured to provide secure access to multiple window elevations while minimising impact on the surrounding building fabric and operational areas of the site.
Given the nature of the works and the importance of the location, the scaffolding solution was designed to be stable, unobtrusive, and fully compliant with current health and safety regulations. Careful positioning ensured uninterrupted access for trades while maintaining a clean and controlled working environment.
Challenges and Solutions
• Working within an iconic and sensitive site requiring careful planning and presentation
• Providing independent access scaffolding without disrupting surrounding structures
• Ensuring safe access for detailed window replacement and timber renewal works
• Completing the project within a short, fixed two-week programme
AMA Scaffolding addressed these challenges through detailed pre-planning, precise scaffold design, and efficient installation, allowing works to proceed safely and on schedule.
Client Experience
AMA Scaffolding worked closely with Loco Services throughout the project to ensure access requirements aligned with the window renovation programme. Clear communication, punctual delivery, and consistent safety standards allowed the project to progress smoothly within the agreed timeframe.
Outcome
The independent access scaffolding solution provided by AMA Scaffolding enabled the successful completion of window replacement and timber renewal works at the National Physical Laboratory. The project was delivered on time, with minimal disruption, and in full compliance with safety and site requirements.
This case study demonstrates AMA Scaffolding’s ability to deliver specialist access scaffolding solutions for short-duration renovation projects within iconic and sensitive locations.